Commercial Concrete

The Challenge
Commercial work splits two ways. On a new build the problem is size — a pad large enough that it has to hold flat across the whole span, poured around a steel frame that's already standing. On a business that's still open, the problem is the opposite: a tight lane, a live customer route, and a hard limit on how long it can stay shut.
The Approach
- 01
Based
Gravel base brought up and compacted across the full footprint before anything else.
- 02
Reinforced
Rebar mat tied out over the whole area and held up off the base so it sits in the slab, not under it.
- 03
Set to Grade
Screed lines run across the pad so the finished surface stays flat over a long span.
- 04
Pumped
Placed off the pump and worked as it came, section by section.
- 05
Worked
Brought to finish while it was ready. On an area this size that's a clock, not a preference.
- 06
Kept Open
On a site that's still trading, the lane gets fenced, poured and handed back in the shortest window the concrete allows.
The Result
Flat across the whole span — and back in service.